Rubicon practice
Before the visit: define the problem
List the openings water has reached, what happened first, the protection goal, who will deploy the system, and where removable parts could be stored. Photos help prepare the visit but do not set fabrication dimensions.
- Opening list and prior water path
- Access, occupants, and deployment responsibility
- Known drains, slab seepage, wall paths, or grading bypass
Rubicon practice
Measurement: capture the fields that drive fit
Rubicon records clear width, proposed protection height, floor and threshold profile, jamb geometry, mounting zones, obstructions, corners, adjacent openings, and the route used to bring panels into position.
- Dimensions at the actual proposed barrier line
- Track, screen, trim, and hardware conflicts
- Wide-span support and full-stack handling needs
Rubicon practice
System design: convert measurements into an opening layout
The design assigns plank lengths, stack height, side-channel locations, any center posts or corners, compression hardware, panel labels, and deployment order. Permanent and removable elements are identified before fabrication.
Limitation
Substrate review: CBS, stucco, wood, and tile
Mounting details are opening-specific. Stucco can conceal masonry or framed construction; tile and finishes affect the approach to the structural substrate; wood conditions and edge distances need review. This page does not prescribe a universal drilling or anchoring method.
- Identify the load-supporting substrate behind finishes
- Review cracks, voids, deterioration, trim, and utilities
- Coordinate repairs or specialist review when the mounting zone is unsuitable
Rubicon practice
Fabrication: build to the accepted opening schedule
After the measured scope and quote are accepted, components are prepared for the identified openings. Labels and assignments matter because similar-looking panels may not be interchangeable.
Rubicon practice
Install: place channels and hardware at the designed line
Installation sets the fixed components and verifies that removable panels and supports assemble without conflicts. The method follows the reviewed substrate and layout, not a universal instruction copied across CBS, stucco, wood, or tile.
Rubicon practice
Initial deployment: assemble the complete system
Rubicon performs an initial deployment to confirm panel order, center-post placement where specified, hardware engagement, access, and removal. The full specified stack and supports are part of the designed configuration.
Limitation
Seal and water check
The floor line, panel joints, channel interfaces, and compression are visually checked for continuous contact. A controlled water check, where appropriate, can identify setup or contact issues; it is not a promise of zero leakage or whole-building floodproofing.
- Clean the floor and seal faces before checking
- Document observed seepage or bypass
- Use the dedicated water-testing guide for scope and limits
Rubicon practice
Storage: keep each opening set deployable
Panels, removable posts, and hardware need a dry, accessible storage location that preserves labels and seal surfaces. Storage should match who will deploy and how parts reach each opening.
Rubicon practice
Homeowner training and project handoff
As a Rubicon practice, the handoff covers opening IDs, panel labels, deployment sequence, storage, seal inspection, service contact, and install photos. Homeowners typically deploy the installed system themselves after this walkthrough.
Rubicon practice
Seasonal inspection
Before expected use, inspect labels, panels, seals, channels, posts, compression hardware, and the floor contact line. Clean debris and request service for damaged, loose, missing, or worn components rather than improvising substitutions.