How flood barrier installation works

Installation starts before any drilling. Rubicon identifies the water path, measures each opening, reviews the mounting substrate, fabricates to the measured schedule, installs, checks seals, labels the panels and trains the people who will deploy them.

Key figures

  • 7 STEPS

    From water-path review to seasonal inspection

    Measurement happens on site before any quote

  • 60 MIN

    Free on-site assessment

    Every opening measured, written quote after the visit

  • 25–73 IN

    Protection height per opening

    3 to 9 planks, 8 inches each, chosen after measurement

Sources: Book the assessment · BarrierX® spec sheet and tensile test

The seven steps.

  1. 01Review the water path

    List the openings water has reached, where it came from first, and who will deploy the system.

  2. 02Measure each opening

    Clear width, protection height, threshold profile, jambs, obstructions, corners and how panels reach the opening.

  3. 03Check the substrate

    CBS, stucco, wood and tile each mount differently. Rubicon finds the load-bearing surface behind the finish.

  4. 04Design and quote

    Plank lengths, stack height, post locations and labels are set, and a written quote follows.

  5. 05Fabricate and install

    Channels and hardware are installed at the designed line, and fasteners are sealed.

  6. 06Test deploy and hand off

    Rubicon assembles the full system with you, checks seal contact, labels everything and agrees a storage spot.

  7. 07Inspect each season

    Before hurricane season, check labels, seals, channels and hardware, and book service for worn parts.

How you deploy it before a storm

Homeowners deploy the system themselves after Rubicon installs the posts and walks through the sequence. Bring the labeled planks to the right opening, clear and check the floor seal line, set any center post specified for the span, stack the planks in order, engage the compression hardware and check that the seal touches all the way along.

  • Follow the opening label and the installed sequence
  • Keep grit and debris out of the seal contact areas
  • Do not leave out a required plank or support
  • Rinse, dry and store the planks after the event

Installation process: common questions.

Do flood barriers require drilling into my house?

Most layouts anchor side channels into the structural substrate. The exact attachment depends on the opening, and Rubicon explains which parts stay permanently and how penetrations are sealed before any work.

How long does flood barrier installation take?

Timing depends on the number of openings and fabrication. Rubicon gives a schedule with the written quote after measurement.

Are the permanent tracks noticeable after installation?

The side channels stay at the opening when the planks are stored. They are slim, and their appearance depends on the opening and finish, which is discussed during measurement.

Ready to close your openings? Start with a free measurement.

Rubicon measures every opening before quoting and sends a written quote after the visit. Rubicon replies within an hour during business hours and can schedule an emergency appointment within 24 hours.

Call Book a free visit